Arrhythmias & electrophysiologyCohort study

Posterior Electrical Axis Deviation Is Associated With Future Development of Left Bundle Branch Block

JACC AdvPublication date not resolved

  • Retrospective data from 35,749 UK Biobank participants
  • excluding those with overt cardiovascular disease
  • Kaplan-Meier analysis and Cox proportional hazards models adjusted for age, sex, hypertension, left ventricular ejection fraction and QRS duration (QRSd)

Authors' conclusion

Posterior deviation of the transverse electrical axis complements QRSd in identifying individuals at risk of developing LBBB. These findings suggest that the electrical axis is capturing early conduction disease and may contribute to risk stratification of future development of LBBB.

Study context

Population
UK Biobank participants without overt cardiovascular diseaseUK Biobank participants analyzed, median follow-up 6 years · developed left bundle branch block (LBBB) 41 · event-free population 35,688
Participants
35,749 participants
Exposure
Associations with axis metrics and LBBB development
  • developed LBBBn = 41
  • event-free populationn = 35,688
Outcome
LBBB development
Follow-up
Median of 6 years

Main finding

As reported in the abstract

Hazard ratio (95% CI)P value
lower φElectricalmultivariable analysis; significantly associated with incident LBBB
0.73(0.56–0.94)
P = 0.014
both high QRSd and low φElectricalfour-fold increased risk
4.09(1.84–8.99)
P < 0.001

Observational data: associations, not effects.

Further findings

Age · older

P < 0.001

Hypertension · more likely to have hypertension

P < 0.001

°

Outcomedeveloped LBBBevent-free populationP value
φElectrical · significantly lower (more posterior) electrical axis69.180.3P = 0.01

Cohort characteristics

age
63.4 ± 7.6 years
male
45%
QRSd
87.4 ± 12.8 ms
median follow-up
6 years

Original publication

Posterior Electrical Axis Deviation Is Associated With Future Development of Left Bundle Branch Block. JACC Adv. doi:10.1016/j.jacadv.2026.102842

Summarised from the published abstract; every number is checked against it